Office
Showroom
8AM - 5PM | MON - FRI
11am - 5pm | TUE-FRI

Rough-In

The early construction phase when wall studs are exposed and drywall is not yet installed. Technicians run all bulk cabling (network, speaker, coax) from the head-end to every room and install back-boxes before the walls are sealed.